Our technicans started in 2015 project in Gdańsk Remontowa Shipbuilding – our task was to prepare installation for loading of generator sets with gas turbines.
Each set was at 10MVA. Network consisted of 3 transformers 6,6kV to 400V 6MVA each. To load the gen sets we used three load banks 6MVA, 5MVA and 2x 3,3MVA. To supply the auxillary installation we have connected two diesel generators 125kVA and 60kVA.
To connect each device in the network we have layed down around 3500 meters of 240mm^2 cables.
Our technicans were responsible for installation, startup of network and constant service on site – generators mainterance, emergency repairs.