During dry docking of Navion Oslo in Gdańsk Remontowa Shipyard our company was responsible for:
Inspection and overhaul of 24 Terasaki circuit breakers located in Main and Emergency Switchboards, breakers was removed from vessel and delivered to our workshop.
Our specialists pulled them down for inspections and overhaul on our test station. After all check and required repairs new certificate was issued for each of them.
Also electricians during docking was inspecting and cleaning all major 440V distribution boards. Also Megger Tests and required equipment repairs was done.
We have also prepared all required cables and penetrations for Konsberg Maritime Radius system on vessel.
Recent projects