Our work on this vessel started (and ended) in 2009 – back then our technicans has rebuided the vessel MSB and electric distribution system to add new generators to the network.

It included distribution of 440V and 400V in which 400 volts network was using other frequency – for that we have used dedicated transformers and frequency drives.

Recently in late 2017 our technicans and mechanics from Vasco company was visiting the vessel to overhaul two of four generators installed back in 2009.