On this vessel our employee was responsible to install onboard additional generator set together with additional Main Switchboard Field to control it. Job was done during planned dry docking period in Turkey.

 

The MSB field was designed, programmed and tested in our workshop in Gdynia. After delivery onboard – our technicans added prepared field to existing switchboard.

All connections from old power distribution system to new field and connection from new generator was prepared and installed by our workers.

Delivered generator – before start required to be cleaned and overhauled to improve it electrical resistance.